Sharjah Teaching Hospital Safety Signage Package
Design, manufacture and install a complete safety signage package for a 320-bed Sharjah teaching hospital, including ISO 7010 pictograms, photoluminescent escape routes, departmental wayfinding, oxygen and medical-gas identification, and controlled-access warnings. The hospital remained fully operational throughout installation.
The Challenge
Design, manufacture and install a complete safety signage package for a 320-bed Sharjah teaching hospital, including ISO 7010 pictograms, photoluminescent escape routes, departmental wayfinding, oxygen and medical-gas identification, and controlled-access warnings. The hospital remained fully operational throughout installation.
Our Solution
Engineered a 1,420-sign package compliant with ISO 7010 (graphical symbols), ISO 3864 (safety colours), and local MoHAP and Sharjah Civil Defence codes. Photoluminescent exit signs were specified for stairwells and corridors with charging verification to DIN 67510, with a phased night-shift installation plan.
Execution
Surveyed and tagged every sign location, manufactured signs in-house on 2 mm aluminium with photoluminescent overlay where required, and installed across 8 floors over 4 weeks of night-shift working. Final commissioning included luminance charging tests on 240 photoluminescent signs and as-built photograph record.
Project Gallery
Related projects
Sharjah Manufacturing Facility Epoxy Floor
Install a hygienic, chemical-resistant floor across a 4,500 mΒ² manufacturing facility with minimal production downtime and strict hygiene requirements.
Sharjah Hamriyah Free Zone Industrial Hazard Marking
Mark hazardous zones, pipe identification and emergency escape routes across a live petrochemical facility in Hamriyah Free Zone Zone 1, with hydrocarbon exposure and ATEX Zone 1 requirements. The facility had to remain operational throughout, with marking applied in classified areas only during permit-controlled shutdowns.
Sharjah University City Road Marking
Re-mark 9.4 km of internal roads and pedestrian crossings across Sharjah's University City campus, with traffic-calming humps, raised pedestrian crossings and dedicated shuttle-bus lanes. The work had to be sequenced around the academic calendar with zero disruption during exam weeks.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- β 10+ years delivering marking projects in the Gulf
- β ISO 9001 certified, RTA & MOMRA compliant
- β ICAO Annex 14 trained aviation crews
- β 850+ projects across 16 cities