Riyadh King Fahd Road Thermoplastic Re-Marking
Re-mark 18 km of Riyadh's flagship King Fahd Road corridor across 6 lanes plus median, upgrading reflectivity to MOMRAH night-driving spec while keeping the road open during daytime peak traffic. The existing lines had degraded after 6 years of Vision 2030-era traffic growth.
The Challenge
Re-mark 18 km of Riyadh's flagship King Fahd Road corridor across 6 lanes plus median, upgrading reflectivity to MOMRAH night-driving spec while keeping the road open during daytime peak traffic. The existing lines had degraded after 6 years of Vision 2030-era traffic growth.
Our Solution
Deployed three self-propelled thermoplastic applicators operating in night-shift windows between 11pm and 5am, applying 3.0 mm hot thermoplastic with simultaneous glass-bead dispensing. All lane lines, edge lines, hatching and arrows were re-marked to MOMRAH Section 705 specification.
Execution
Crews pre-marked with laser guidance, water-blasted ghost lines, and applied thermoplastic at 185°C. Reflectivity was tested every 500 m to R3 (≥300 mcd/m²/lx). A total of 124 km of line was applied across 70 night shifts, with daytime lanes kept fully open throughout.
Project Gallery
“Gulf Seismic's night-shift operation on King Fahd Road was exemplary — they kept Riyadh moving during peak Vision 2030 traffic.”
Related projects
Abu Dhabi–Al Ain Highway Thermoplastic Marking
Re-mark 42 km of a high-speed inter-city highway with minimal lane closures during peak pilgrimage and commuter traffic, while upgrading reflectivity to night-driving standards.
Riyadh Logistics Hub Warehouse Floor Marking
Mark 22,000 m² of a 24/7 logistics warehouse with forklift lanes, pedestrian walkways, and storage bays, while keeping the facility operational throughout.
Dubai Sheikh Zayed Road Thermoplastic Re-Marking
Re-mark 14 km of Dubai's flagship Sheikh Zayed Road corridor across 6 lanes plus hard shoulder, upgrading reflectivity to RTA night-driving spec while keeping the highway open during daytime peak traffic. The existing lines had degraded after 5 years of heavy HGV and commuter traffic.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- ✓ 10+ years delivering marking projects in the Gulf
- ✓ ISO 9001 certified, RTA & MOMRA compliant
- ✓ ICAO Annex 14 trained aviation crews
- ✓ 850+ projects across 16 cities