Dubai Sheikh Zayed Road Thermoplastic Re-Marking
Re-mark 14 km of Dubai's flagship Sheikh Zayed Road corridor across 6 lanes plus hard shoulder, upgrading reflectivity to RTA night-driving spec while keeping the highway open during daytime peak traffic. The existing lines had degraded after 5 years of heavy HGV and commuter traffic.
The Challenge
Re-mark 14 km of Dubai's flagship Sheikh Zayed Road corridor across 6 lanes plus hard shoulder, upgrading reflectivity to RTA night-driving spec while keeping the highway open during daytime peak traffic. The existing lines had degraded after 5 years of heavy HGV and commuter traffic.
Our Solution
Deployed two self-propelled thermoplastic applicators operating in night-shift windows between 12:00am and 5:00am, applying 3.0 mm hot thermoplastic with simultaneous glass-bead dispensing. All lane lines, edge lines, hatching and arrows were re-marked to RTA Standard Drawings.
Execution
Crews pre-marked with laser guidance, water-blasted ghost lines, and applied thermoplastic at 185Β°C. Reflectivity was tested every 500 m to R3 (β₯300 mcd/mΒ²/lx). A total of 88 km of line was applied across 56 night shifts, with daytime lanes kept fully open throughout.
Project Gallery
βGulf Seismic's night-shift operation on Sheikh Zayed Road was textbook. They kept Dubai moving and delivered reflectivity that exceeded our RTA spec.β
Related projects
Abu DhabiβAl Ain Highway Thermoplastic Marking
Re-mark 42 km of a high-speed inter-city highway with minimal lane closures during peak pilgrimage and commuter traffic, while upgrading reflectivity to night-driving standards.
Dubai Mega-Mall Parking Deck Marking
Re-mark a 3,200-bay multi-level parking deck without closing the mall, while re-optimising the layout to increase capacity and add EV and family bays.
Dubai Expo City Visitor Parking Lot Marking
Mark a 3,800-bay surface parking lot at the legacy Expo 2020 site (now Expo City Dubai) ahead of its reopening as a permanent visitor destination. The lot required EV, accessibility and family zones plus wayfinding colour coding, with all work completed before opening weekend.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- β 10+ years delivering marking projects in the Gulf
- β ISO 9001 certified, RTA & MOMRA compliant
- β ICAO Annex 14 trained aviation crews
- β 850+ projects across 16 cities