Jubail Industrial City Internal Road Marking
Re-mark 16 km of internal roads within Jubail Industrial City serving petrochemical plants, with heavy HGV traffic, dust accumulation and high ambient temperatures. The existing lines had been abraded by HGV traffic and degraded by UV exposure within 4 years, requiring a longer-life solution.
The Challenge
Re-mark 16 km of internal roads within Jubail Industrial City serving petrochemical plants, with heavy HGV traffic, dust accumulation and high ambient temperatures. The existing lines had been abraded by HGV traffic and degraded by UV exposure within 4 years, requiring a longer-life solution.
Our Solution
Specified a 4.0 mm hot-applied thermoplastic system (1 mm thicker than standard) with high-build Type II glass beads and added anti-skid aggregate on intersection approaches. Preformed thermoplastic hazard arrows and stop bars were used at plant-gate intersections to improve night-time delineation for HGV drivers.
Execution
Crews worked in 12-hour day shifts, water-blasting and re-profiling the surface before applying 4.0 mm thermoplastic at 190Β°C. A total of 64 km of line was applied across 16 km of road, with anti-skid aggregate broadcast on 6.4 km of intersection approaches and 28 hazard symbols installed at plant gates.
Project Gallery
Related projects
Jubail Petrochemical Plant Hazard Marking
Mark hazardous zones, pipe identification and emergency escape routes across a live petrochemical plant with hydrocarbon exposure and ATEX requirements.
Abu Dhabi Corniche Bicycle Lane Thermoplastic Marking
Install a continuous 6.2 km dedicated bicycle lane along the Abu Dhabi Corniche promenade with high skid resistance and UV-stable red colouring that would not fade under direct coastal sun. The work had to be done without closing the popular corniche to pedestrians or cyclists outside early-morning windows.
Sharjah University City Road Marking
Re-mark 9.4 km of internal roads and pedestrian crossings across Sharjah's University City campus, with traffic-calming humps, raised pedestrian crossings and dedicated shuttle-bus lanes. The work had to be sequenced around the academic calendar with zero disruption during exam weeks.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- β 10+ years delivering marking projects in the Gulf
- β ISO 9001 certified, RTA & MOMRA compliant
- β ICAO Annex 14 trained aviation crews
- β 850+ projects across 16 cities