Fujairah Corniche Coastal Road Marking
Re-mark 5.4 km of the Fujairah Corniche coastal road with high-humidity-tolerant materials, edge lines, pedestrian crossings and parking-bay demarcation along the beachfront. Coastal humidity and salt spray had degraded previous cold-paint markings within 14 months.
The Challenge
Re-mark 5.4 km of the Fujairah Corniche coastal road with high-humidity-tolerant materials, edge lines, pedestrian crossings and parking-bay demarcation along the beachfront. Coastal humidity and salt spray had degraded previous cold-paint markings within 14 months.
Our Solution
Specified hot-applied thermoplastic throughout for humidity resistance, with anti-skid aggregate on pedestrian crossings and preformed thermoplastic symbols at intersection stop bars. Edge lines received Type II glass beads for night delineation along the corniche promenade.
Execution
Water-blasted ghost lines and surface contaminants, then applied 3.0 mm thermoplastic with simultaneous glass-bead dispensing. A total of 21 km of line was applied across 5.4 km of corniche road, plus 11 raised pedestrian crossings with anti-skid surface and 280 roadside parking bays.
Project Gallery
Related projects
Abu Dhabi Corniche Bicycle Lane Thermoplastic Marking
Install a continuous 6.2 km dedicated bicycle lane along the Abu Dhabi Corniche promenade with high skid resistance and UV-stable red colouring that would not fade under direct coastal sun. The work had to be done without closing the popular corniche to pedestrians or cyclists outside early-morning windows.
Sharjah University City Road Marking
Re-mark 9.4 km of internal roads and pedestrian crossings across Sharjah's University City campus, with traffic-calming humps, raised pedestrian crossings and dedicated shuttle-bus lanes. The work had to be sequenced around the academic calendar with zero disruption during exam weeks.
Fujairah Port Tank Farm Industrial Hazard Marking
Mark hazardous zones, pipe identification, bunded-area escape routes and emergency shower signage across a live Fujairah Port crude and product tank farm with 36 storage tanks, hydrocarbon exposure, and ATEX Zone 1 classified areas. The facility had to remain operational throughout, with marking scheduled around PTW windows.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- β 10+ years delivering marking projects in the Gulf
- β ISO 9001 certified, RTA & MOMRA compliant
- β ICAO Annex 14 trained aviation crews
- β 850+ projects across 16 cities
