Dammam Eastern Province Energy Facility Marking
Mark hazardous zones, pipe identification, bunded-area escape routes and emergency shower signage across a live Eastern Province power-and-water facility with 8 generating units, hydrocarbon exposure, and ATEX Zone 1 classified areas. The facility had to remain operational throughout, with marking scheduled around PTW windows.
The Challenge
Mark hazardous zones, pipe identification, bunded-area escape routes and emergency shower signage across a live Eastern Province power-and-water facility with 8 generating units, hydrocarbon exposure, and ATEX Zone 1 classified areas. The facility had to remain operational throughout, with marking scheduled around PTW windows.
Our Solution
Applied novolac epoxy systems rated for hydrocarbon exposure in process zones, with polyurea traffic lanes, ASME A13.1 pipe banding on 14 km of pipework, and photoluminescent escape-route marking on bund walls and stairways. All work was ATEX-permit-controlled with intrinsically safe equipment.
Execution
Conducted HAZID and substrate audit, water-jetted and profiled surfaces, then applied novolac epoxy in bunded zones and polyurea in traffic corridors. Pipe banding was installed on 14 km of pipework per ASME A13.1 colour code, and 2.8 km of photoluminescent escape route was applied with charging-verification testing per DIN 67510.
Project Gallery
Related projects
Jubail Petrochemical Plant Hazard Marking
Mark hazardous zones, pipe identification and emergency escape routes across a live petrochemical plant with hydrocarbon exposure and ATEX requirements.
Dammam Airport Taxiway Marking Upgrade
Upgrade taxiway and apron markings to ICAO Annex 14 within night-shift NOTAM windows, with jet-blast resistance and high wet-reflectivity.
Sharjah Hamriyah Free Zone Industrial Hazard Marking
Mark hazardous zones, pipe identification and emergency escape routes across a live petrochemical facility in Hamriyah Free Zone Zone 1, with hydrocarbon exposure and ATEX Zone 1 requirements. The facility had to remain operational throughout, with marking applied in classified areas only during permit-controlled shutdowns.
Start your marking project today
Choose the channel that suits you. Our specialists respond within 1 business hour during working days.
Why Gulf Seismic?
- ✓ 10+ years delivering marking projects in the Gulf
- ✓ ISO 9001 certified, RTA & MOMRA compliant
- ✓ ICAO Annex 14 trained aviation crews
- ✓ 850+ projects across 16 cities
